Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Volvo V60 Plug-in Hybrid (2012): first details

Fri, 28 Jan 2011

Volvo will unveil its new V60 Plug-in Hybrid at the 2011 Geneva motor show in March. The new Volvo V60 Plug-in Hybrid is described as 'virtually production-ready' and will be built and sold by the Swedish car company from 2012. Driving the front wheels through a six-speed automatic is an upgraded version of Volvo's 2.4-litre five-cylinder D5 engine: power and torque goes up from 202bhp and 309lb ft to 213bhp and 325lb ft.

Mercedes SLK 55 AMG and Ducati Streetfighter 848 in Bologna

Thu, 01 Dec 2011

Mercedes SLK 55 AMG and Ducati Streetfighter 848 set for Bologna The Mercedes SLK 55 AMG and the Ducatti Streetfighter 848 – both finished in ‘Streefighter Yellow’ – are set to appear at the Bologna Motor Show. It’s almost exactly a year since the announcement that Mercedes AMG and Ducatti were to work together to promote both the AMG and Ducatti Brands. But we’ve not really see a lot of evidence of their collaboration so far.

GM delays second shift at Volt plant

Fri, 07 Oct 2011

General Motors is delaying the addition of a second shift at its Michigan assembly plant that makes the Chevrolet Volt. In May, GM said that it would add a second shift at its Detroit-Hamtramck plant by late this fall to double Volt production. Instead, a plant overhaul completed this summer, along with a more-modest addition of workers, will allow GM to double production starting early next year while remaining on one shift, the company said Friday.